Schedule Lens

See the schedule you've been asked to defend.

A time-scaled Gantt with hierarchical WBS, validator stripes, click-to-drill diagnostics, and overlays for every condition that makes a schedule not safe to risk-load.

Schedule Lens reference-data view — WBS tree, time-scaled Gantt and side panel
Internal reference benchmark · 5,869 activities · 4.3 sec renderWBS tree, critical-path bars, validator stripes and click-to-drill diagnostic panel.
Anatomy of a Lens view

Every overlay, labelled.

Annotated Schedule Lens view
WBS treeCritical-path barsInsight panelSearch · zoom · filter
5,869
activities rendered in 4.3 seconds on an internal reference dataset
10,748
relationships drawn at the same time
75
per-activity check stripes — colour-coded by framework
4
frameworks visible at once: SOMA · DCMA · CIOB · Acumen
Built for planners

The overlays you need. Where you need them.

Hierarchical WBS tree

Collapsible sidebar with descriptive labels ("KM — Project Key Dates & Summary Activities"), not just codes. Expand or filter to any depth.

Validator stripes

Per-activity stripes coloured by framework. See at a glance which activities fail SOMA's checks, DCMA's, CIOB's or Acumen's.

Critical-path bars

Distinct fill for critical activities. Milestone diamonds for zero-duration tasks. Lock icons for MSO/MFO constraints.

Open-end markers

Activities with no predecessor or successor are flagged inline. Dangling outline. Negative-lag connectors highlighted.

Out-of-sequence indicators

Activities progressing despite incomplete predecessors are tagged. Reportable, fixable, traceable.

Hatch overlay for non‑risk‑loadable

Summaries, milestones, and locked activities are shown with a hatch fill. They never enter the Monte Carlo by accident.

Click-to-drill

Every diagnostic, every trace, one click away.

Click any bar. A slide-in panel shows the activity record, clickable predecessor/successor lists, and the full diagnostic trace — every check that activity failed, every framework that flagged it.

  • Diagnostic trace — failed checks listed with rule ID, severity, and source field.
  • Pin issues into an agenda as you go and work through the list with the planner in one sitting.
  • Share‑link URL state — share a deep link with filters, WBS branch and pinned issues preserved.
  • This is the tab the analyst and planner sit beside each other to use. The whole UI is designed for that conversation.
Schedule Lens drill-through: activity diagnostic trace with predecessor, successor and validation detail
Click-to-drill · diagnostic traceEvery failed check listed with rule ID, severity and source field. Add to agenda or jump to the activity.
Standalone or integrated

Reach Schedule Lens however you work.

Inside the product

Available as a scheme tab after setup. It loads framework results and the active WBS under the tenant's storage controls.

Reference-data demonstration

Public briefings use approved reference data. Client files enter only through the governed secure intake after qualification.

Open the reference schedule with us.

See how the product presents relationships, findings and source trace without sending client content through the public site.