Contingency drawdown
Track P50 and P80 against actual spend and consumed float period-on-period, on the same audit chain as the run that set them.
Each module below shows its current availability. The status page carries the full evidence picture.

Four-framework validation, Schedule Lens diagnostics and traceable quantitative cross-checks under agreed controls.
Read the specTime-scaled Gantt with hierarchical WBS, critical path, milestones, open ends, dangling outlines, click-to-drill diagnostic trace.
See it moveCost risk register and internal quantitative modelling for supervised evaluation only. Formal validation remains open.
Module detailCombined schedule and cost risk modelling is not currently offered.
Read the boundaryFuture capability is shaped through governed practitioner evaluation. Bring a friction point or assurance check you need to examine.
Start the conversationThe controlled workflow end to end — every frame below uses approved reference data, never client content.
Manual entry, paste‑in, standard template or non‑standard importer — four lanes onto the same schedule, with the source row kept beside every value.

SOMA QSRA Readiness, DCMA 14‑point, CIOB PP21 and Acumen Fuse SQI run together. Each finding explains why — and points to the exact row, column or activity.

Higham PSD repair, NORTA and six distributions produce S‑curves and Spearman tornados — deterministic cross‑check evidence for supervised review.

Excel, Weblink HTML, PDF and PPTX drafts carry the same audit chain as the run that produced them — reviewed by a person before anything leaves the building.


| Lane | Module | Status | Boundary |
|---|---|---|---|
| Schedule risk modelling | QSRA | Available | Works alongside the approved engine of record |
| Visual schedule diagnostics | Schedule Lens | Available | Fictional reference demonstration |
| Cost risk modelling | QCRA | Supervised evaluation | Formal validation open |
| Combined schedule + cost | QSCRA | Not offered | Outside current scope |
No roadmap date or release promise is currently authorised.
Track P50 and P80 against actual spend and consumed float period-on-period, on the same audit chain as the run that set them.
Certified portfolio aggregation across schemes under an independence assumption; inter-scheme dependencies are not modelled, so the roll-up is cross-check evidence only.
One governed hub for risks and assumptions, with mandatory provenance on every row and register lifecycle states from draft through to accepted.
A workshop mode that captures duration uncertainty in absolute days rather than percentages, so estimators work in the units they defend.
What's next. We publish the directions we are designing next — nothing is claimed until it is evidenced. See what's being designed next →
We'll walk through the capability and its current limits using approved reference data — no client files needed.