Product

What Risk Studio includes — and what it does not.

Each module below shows its current availability. The status page carries the full evidence picture.

SOMA Risk Studio portfolio console — fictional reference schemes, no client content
Portfolio console · reference viewA fictional reference view used to explain the candidate without client content.
Walkthrough

Reference data in. Traceable draft out.

The controlled workflow end to end — every frame below uses approved reference data, never client content.

  1. Step 01 · Inputs

    Bring the schedule in, however it arrives.

    Manual entry, paste‑in, standard template or non‑standard importer — four lanes onto the same schedule, with the source row kept beside every value.

    Scheme files and module navigation in Risk Studio
  2. Step 02 · Validate

    Four frameworks, every failure traced.

    SOMA QSRA Readiness, DCMA 14‑point, CIOB PP21 and Acumen Fuse SQI run together. Each finding explains why — and points to the exact row, column or activity.

    Validation findings traced to source rows
  3. Step 03 · Model

    Internal Monte Carlo as cross‑check evidence.

    Higham PSD repair, NORTA and six distributions produce S‑curves and Spearman tornados — deterministic cross‑check evidence for supervised review.

    Internal Monte Carlo run configuration and progress
  4. Step 04 · Deliver

    Draft outputs for supervised review.

    Excel, Weblink HTML, PDF and PPTX drafts carry the same audit chain as the run that produced them — reviewed by a person before anything leaves the building.

    Draft deliverables produced from the same audit chain
How it fits together

One toolkit, four deliverables, one source of truth.

Scheme files and module navigation
Module navigationEach module is a tab on the scheme page. Switch between QSRA, Lens and QCRA without losing state.
LaneModuleStatusBoundary
Schedule risk modellingQSRAAvailableWorks alongside the approved engine of record
Visual schedule diagnosticsSchedule LensAvailableFictional reference demonstration
Cost risk modellingQCRASupervised evaluationFormal validation open
Combined schedule + costQSCRANot offeredOutside current scope

No roadmap date or release promise is currently authorised.

Across the modules

Capabilities that travel with every scheme.

Contingency drawdown

Track P50 and P80 against actual spend and consumed float period-on-period, on the same audit chain as the run that set them.

Portfolio and programme aggregation

Certified portfolio aggregation across schemes under an independence assumption; inter-scheme dependencies are not modelled, so the roll-up is cross-check evidence only.

Register hub

One governed hub for risks and assumptions, with mandatory provenance on every row and register lifecycle states from draft through to accepted.

Absolute-days duration uncertainty

A workshop mode that captures duration uncertainty in absolute days rather than percentages, so estimators work in the units they defend.

What's next. We publish the directions we are designing next — nothing is claimed until it is evidenced. See what's being designed next

See Risk Studio working with reference data.

We'll walk through the capability and its current limits using approved reference data — no client files needed.